Swiss-led mining infrastructure from TellCo Europe
Aerial view of mine processing and road infrastructure
Mining Workflow

Haul Roads

A route infrastructure configuration for haul roads, ramps, access corridors, checkpoints, and parking areas that need solar lighting, asset visibility, and safer operating evidence.

Configuration

Route Lighting and Visibility Without Heavy Fixed Works

Haul roads often need better visibility before permanent electrical infrastructure is practical. TellCo configures solar LED lighting, GPS tracking, and monitored service routines by road segment.

The configuration can begin with priority zones such as intersections, berms, parking areas, weigh points, gates, fueling areas, and maintenance pull-offs, then expand across corridors.

Features

What the Haul Road Setup Provides

L

Solar Road Lighting

Self-contained solar LED points can be deployed along selected routes without extending grid cabling first.

V

Asset Visibility

GPS tracking helps teams understand where mobile infrastructure and service assets are located.

R

Route Service Records

Inspection, maintenance, and incident notes create a practical record for safety and service follow-up.

Benefits

Why Lit, Tracked Roads Pay Off

Safety

Improved Visibility

Lighting helps drivers, workers, and security teams see route edges, junctions, and activity zones.

Speed

Staged Road Coverage

Priority road segments can be upgraded before a full electrical extension is justified.

Cost

Less Trenching Pressure

Solar lighting can reduce early dependence on cable runs, trenching, and generator-fed light towers.

Evidence

Better Corridor Records

Service records and GPS data support route audits, maintenance planning, and expansion decisions.

Implementation

How Haul Road Infrastructure Is Rolled Out

01

Survey

Map routes, intersections, gradients, traffic patterns, high-risk points, and existing power access.

02

Prioritize

Select the first lighting and visibility zones by safety value, operating hours, and installation access.

03

Install

Deploy lighting, mounts, tracking devices, and any route-node power equipment with site safety checks.

04

Verify

Test coverage, record asset locations, confirm handover, and document inspection responsibilities.

05

Expand

Use operating records to extend coverage across additional route sections or mine phases.

Prioritize the Right Haul Road Segments

TellCo can map lighting, tracking, and service records around the routes with the highest operational value.

Request Site Assessment